New construction for even more comfort in the ski area

Efficiency, safety and skiing pleasure

Dachstein West is entering a new era with the ground-breaking ceremony for two new 6-seater chairlifts (6SB Angeralm und 6 SB Aussichtsberg): by the 2025/26 winter season, modern lift facilities including a technical centre will be built, making skiing between Gosau and Annaberg even more comfortable and efficient.

The investment of 22 million euros sends a clear signal for the future of winter sports in the region - with even more quality, safety and skiing comfort for our guests. The next winter is sure to come - and will bring many innovations with it.

Snowy landscape with a ski lift labeled "6SB Angeralm," trees, and a small snow-covered pond under a cloudy sky.
Snow-covered industrial building surrounded by pine trees and hills, with a crane and ski lift in the background under a cloudy sky.
Snow-covered landscape with evergreen trees, a construction crane, and mountains in the background under a blue sky.
Snowy construction site on a mountain with machinery, metal beams, and a ski lift in the background under a bright sun and clear sky.

Details & Facts

6 SB Aussichtsberg & 6 SB Angeralm
DriveAussichtsbergValleyAngeralmValley
Rope height valleymAussichtsberg1.329,15 Angeralm1.329,15
Rope height mountainmAussichtsberg1.586,50Angeralm1.474,00
Oblique track lengthmAussichtsberg947,72Angeralm 573,10
Driving distancemAussichtsberg982,28 Angeralm615,42
Travel speed distancem/sAussichtsberg 5,0Angeralm5,0
Final capacityP/hAussichtsberg2.400Angeralm2.221
Travel time from end to exitminAussichtsberg3,99Angeralm2,77
Number of vehicles in final phasepcs.Aussichtsberg48Angeralm30
Number of support towerspcs.Aussichtsberg9Angeralm8